1. Deck Update – the north deck and deck between Bldgs 2 & 3 was opened on Tuesday. The bollards were reinstalled in front of the Bldg 3 generator, the parking stops were put back in place by being glued down and sealed in. The epoxy sealer was painted over with deck coating material to make a very neat presentation. The north BBQ has been re-installed along with the picnic table. Planter pots were placed back along the pool fence and in the parking area between spots. The entire south deck has now been scraped of the old material. As of Friday, the high speed pressure cleaning is underway. Segment two will be given the primer coats and base coat. This should be completed by Tuesday.
2. Maintenance still has a list of items to finish up to complete the deck. These items include re-installing the hurricane tracks, window washing, painting the columns and wing walls, re-installing the wiring for the deck lights around the wing walls, among others.
3. Six of the worst sit up chairs have been removed from the pools as requested. These chairs are old, rotted and generally eyesore.
4. Ten additional parking stops have been obtained to replace the broken and cracked ones removed during deck surface removal. One additional planter and 8 planter dishes have been ordered as well.
5. Channel 4 TV Guide is currently out of service. MDU has been notified and it will be Tuesday before they can come for service.
6. Manager and Christina walked the outside of the property to look for any items that needed immediate attention (see item 3 above). We were out of the office for about 20 minutes as it was very slow on Thursday. This is part of Christina’s ongoing training. Appropriate signage was left on the office door.
7. On August 23rd the management received a very nice letter from a long time resident about the current appearance of the property. Click HERE to read the letter. The resident's name has been removed for Internet security reasons.