Sunday, October 26, 2014
Friday, October 24, 2014
BOD Meeting - Draft Minutes of 10/08/2014 Meeting
Please click or tap on the link below to view a draft of the October 8, 2014 Board of Directors meeting.
DRAFT - 10/08/2014 BOD MINUTES
Category:
Board of Directors Related
Thursday, October 23, 2014
Manager's Report - Weekly Highlights - 10/17/2014
Please forgive the delay in posting this manager's report which was submitted to board members on Oct. 17. Thank you. Valle Ingram, your T.A.N. editor.
1. JES our concrete contractor and Picture Perfect Pools have completed their
projects. We have received all releases of lien from both contractors and signed
off on building permits. Both contractors have been paid in full.
2. The 2015 budget packages have been mailed out. The budget meeting will be
held November 5, 2014 at 7pm in the Bldg. 3 social room.
3. We are in the process of painting all the wing walls that have had concrete
work done. When we are finish with Bldg. 3 we will start on Bldg. 2.
4. All of the air conditioners in the common areas of Bldgs. 1, 2 and 3 have had their filters
changed.
5. The entrance gates to the north pool have been scraped and painted.
6. A Tree Work Shop was held Thursday. Oct. 15. and chaired by Ruth H. The purpose of the workshop was to discuss removal of the pine trees on the far south end of the property.
7. A Camera Work Shop is scheduled for Weds. October. 22, 2014 It will be
chaired by John Bird.
8. The entrances from the road to the L/P elevator lobby floor have been painted.
Thursday, October 16, 2014
Monday, October 6, 2014
Board of Directors Meeting - 10/08/14 - Agenda
Yes, there will be a regularly scheduled BOD Meeting on Wednesday, October 8th, 2014 in the Bldg. 3 Social Room st 7pm. Click or tap HERE to read the agenda for the meeting. The phones will be open for those Board Members not on the premises.
Category:
Board of Directors Related
Saturday, October 4, 2014
Manager's Report - Weekly Highlights - 10/03/14
1. The proposed annual and monthly budget for year 2015 is
finalized. A reserve analysis worksheet will be included in the package to be handed out in the November. 5, 2014 BOD Meeting where proxy ballots for the 2015 budget will be counted. lt will also be
included with the proxy ballot which will be mailed out next week to all unit owners. Click on the links below to view the ballot and the reserve analysis worksheet:
2. We extend our condolences to Christina Arlotta whose Grandfather passed away last week.
Christina will be attending the services. We expect her back on Monday,
October 6, 2014.
3. During a lighting storm last week the roof top A/C unit in
Bld. 3 automatically turned off. We re-set it and its working fine.
4. lnspections of the concrete restoration for Bldgs 2 and 3 will be completed
this week. The inspections are conducted by our engineer, JES construction and a board
member.
5. Power washing of the entire lower parking deck has been
completed.
6. Cleaning of the overhead lights is ongoing, as well as painting
of the bumper blocks.
7. Our current delinquencies as reported by Treasurer, Alice K. amount to $57,217.12.
8. The north pool is 98% completed. Final inspection will take place on Friday Oct. 3, 2014. (See picture above)





